Uganda Electricity Generation Company Limited (UEGCL) is developing the Muzizi Hydropower project located in Western Uganda on the Muzizi River, 6km south-east of Lake Albert.

The project will be implemented under an Engineering, Procurement and Construction (EPC) contractual arrangement.

Tender information for Muzizi Hydropower project

The procurement process shall be carried out under international competitive bidding with a two-stage process including prequalification stage and tendering stage.

It shall be conducted in accordance with KfW Development Bank’s “Guidelines for Procurement of Goods, Works and associated Services in Financial Cooperation with Partner Countries” which is available at: https://www.kfwentwicklungsbank.de/Download-Center/PDF-Dokumente-Richtlinien/Vergabe-E.pdf

The prequalification process shall be carried out based on two separate lots:

  • Lot 1 – Civil works: The scope of works to be prequalified under lot 1 includes the civil engineering and construction of hydraulic structures such as the dam/weir, intake and reservoir, water conveyance structures such as headrace tunnel, pressure shaft, pipe gallery, powerhouse and tailrace channel, as well as foundations for the switchyard facilities and 132kV and 33kV transmission lines, access roads and operators’ permanent camp and all other civil structures of a hydro power plant including compensation measures.

The scope includes also the O&M management and training of the O&M staff of the client.

  • Lot 2 – Electrical and mechanical works: The scope of works under Lot 2 includes the engineering, manufacture, supply, installation and commissioning of all mechanical and electrical works including three high-head, multi-jet (6), vertical-axis Pelton turbines and generator sets including control systems, transformers, SCADA, switchyard and balance of plant.

It also includes hydro-mechanical equipment (powerhouse and dam), steel-lined pressure shaft, steel penstock pipes and the 132kV and 33kV transmission lines. The scope includes also the O&M management and training of the O&M staff of the client.

Prequalification

UEGCL is inviting all interested competent bidders to submit applications for prequalification to participate in the bidding process for the selection of an EPC contractor for the project.

At this stage, a company shall only apply to be pre-qualified for either Lot 1 or Lot 2.

The closing date and time for the submission of the responses to this request for prequalification is 07 August 2017 by 16:00 hours (Ugandan time) at the latest.

The pre-qualification documents, in English, may be purchased by interested applicants on the submission of a written application to the address below and proof of payment of a non-refundable fee of $100 to:

A/C Name: Uganda Electricity Generation Company Limited Projects

A/C No. 9030011177386

Branch: Kampala Branch (Corporate)

Bank: Stanbic Bank Uganda Limited

Swift Code: SBICUGKXXXX

Address: Uganda Electricity Generation Company Ltd,

Block C, Victoria Office Park, Plot 6-9 Okot Close, Bukoto

P.O Box 75831, Kampala- Uganda

For the attention of: The Head of Procurement and Disposal Unit

Copy: The Project Manager, Muzizi Hydropower Project

Subscribe to tenders service

For more detailed tenders you can subscribe to our Tender Subscription Service.

By partnering with a global information provider, ESI Africa can offer a database of opportunities for the energy industry direct to your inbox.

An annual subscription gives access to tender notices across the African continent for all energy sectors.

 

Featured image source:Aqua jet