Baptista on Ibo island
in Mozambique.
In a statement published here, EdM also said that the project, which cost US$6 million, included 7 km of medium voltage cables, 10km of undersea cables between Quissanga and Ibo, as well as two e 2 transformation posts.
So far 19 connections to the island have been made and in the next few days over 250 new connections are due to be completed.
The island “’ which is part of the Quirimbas National Park “’ is 10km long by 5km wide, and is almost totally urban.