Featured image: Stock

In an effort to pre-empt national legislation, the City of Cape Town has issued a notice requiring registration of all solar PV systems on or before 31 May 2019.

All Cape Town home and business owners with rooftop solar photovoltaic installations are required to register both grid-tied and off-grid small-scale embedded generation (SSEG) systems.

Take the vote and express your feelings on having to register or face a fine.

On Twitter you said...

On Facebook you said...

What are your thoughts on having to register your #SSEG and #solar PV system with the City of Cape Town before 31 May 2019?

Posted by ESI Africa on Thursday, May 23, 2019

Read more: Register your solar PV system before 31 May 2019, warns City of Cape Town