Eskom have announced that no load shedding will occur the entire week next week due to the public holidays.

Black-outThe reason is primarily due to the reduced load anticipated as a result of the public holidays. The evening system peak is tight during this period, but they don’t anticipate a need to load shed, unless there are problems on the system.

Load shedding will resume on Monday the 5 May 2008.