SA muni installs nanofiltration water treatment plant

eThekwini Water & Sanitation (EWS) municipality in Durban, explains how it has installed its first nanofiltration membrane water treatment plant.

Nanofiltration membrane technology – It’s not one of your conventional water treatment processes used in South Africa nor is it the kind of technology that is used in the municipal water treatment industry.

Nanofiltration installation

The project was initiated after the water from two boreholes namely ND64 & ND65 were tested and found to have high levels of iron, fluorides and manganese.

It was further found that there is a high cost associated with supplying water to the local community via water tankers.

In 2013 EWS appointed Veolia to design, build, install and operate and maintain (for a four month period) a nanofiltration membrane water treatment plant.

Design for the plant began in April 2015 with construction starting in May 2016. The operation and maintenance phase commenced in October 2016.

Currently the project is in the final month of the operation and maintenance phase and will be handed over to EWS in early February 2017.

The plant has been installed on E5 reservoir site and designed to treat the water from the two boreholes to potable water standards before being distributed to the local community via the water distribution network.

The plant is designed to operate for 10 hours per day treating 100kl of raw water with a 20% rejection rate, therefore the plant is capable of producing 80kl of potable water.

The plant is currently producing 60kl/day of potable water due to pumping restrictions on the borehole pumps which limits the amount of raw water the plant receives.

This project has faced many challenges which has been overcome by the individuals from various departments working together to ensure that this project is a success.

The project team has shown a high degree of professionalism, hard work and dedication which ensured the project is a success.

Identified challenges faced and potential challenges

  • Community unrest due to labour issues.
  • High number of power outages due to bad weather conditions. Two options are being investigated to ensure a consistent power to the plant. Installation of a generator and installation of solar panels.
  • Potential theft and vandalism due to the plant being located in a remote rural area, the option of providing a security guard through the EPWP (Expanded Public Works Programme) is being investigated. As part of the project the reservoir fence has been upgraded and is now equipped with a double coiled ripper razor wire fence which is also a trial to determine its effectiveness.
  • The water distribution network has deteriorated due to it not being used for a lengthy period of time. A temporary water tanker filling point has been installed to allow for the distribution of the water to the community.

 

Featured images: EWS

Share This Article
Join the Discussion

Leave a Reply

Notify of
avatar
Sort by:   newest | oldest | most voted
999drugs.com
Guest

Water treatment plants are essential for our living, but not all the plants are effective in water purrification. It is great to hear that certain actions are taken to improve this issue.

wpDiscuz